Oil Pipelines and the Rivers

A scattering of small boats on wide blue water, with low, bare hills along the far shore
Boats on Lake Oahe in South Dakota. The reservoir, behind Oahe Dam on the Missouri River, reaches north into North Dakota, where Dakota Access crosses beneath it. Photo: Federal Highway Administration, National Scenic Byways Program, National Archives, NAID 7720609 (public domain)

No oil pipeline crosses the core of the Black Hills. Federal pipeline maps show crude oil lines running through the outer foothills on the Wyoming side, a few miles west of Devils Tower, and a fuel line skirting the Hills’ southern and eastern edges to Rapid City. The oil pipelines that matter to western South Dakota lie on the plains and under the Missouri River: Keystone XL, planned across the western half of the state and cancelled in 2021; the Keystone line that has run through the eastern counties since 2010; and Dakota Access, which carries North Dakota crude beneath Lake Oahe about half a mile above the Standing Rock Reservation.

What Runs Near the Hills

The oil lines nearest the Hills follow their edges, and most of the lines in the area carry something other than crude. Energy Information Administration maps, using 2025 data, show two crude trunk lines on that side: the Butte Pipeline, running north and south through western Crook County, Wyoming, and on into Weston County, a few miles west of Devils Tower, and the Belle Fourche Pipeline farther west, near Moorcroft. A refined-fuel line from Wyoming passes Edgemont, Buffalo Gap and Hermosa on its way into Rapid City. South Dakota’s spill records list gasoline, diesel and jet fuel releases from pipelines in Fall River, Custer and Pennington counties since 1975, the latest in Rapid City in 2022. Two lines carrying natural gas liquids, which are not oil, run through the Wyoming side of the Hills between Beulah and Newcastle.

What Happened to Keystone XL?

Keystone XL was to carry up to 830,000 barrels of crude a day from Alberta to Steele City, Nebraska, with about 315 miles in South Dakota. The route ran southeast across the plains through Harding, Butte, Perkins, Meade, Pennington, Haakon, Jones, Lyman and Tripp counties and crossed the Little Missouri, Grand, Moreau, Cheyenne, Bad and White rivers. The Cheyenne drains much of the Black Hills on its way to the Missouri. Nearly all of the route lay inside the Great Sioux Reservation as the 1868 Fort Laramie Treaty drew it, though the state found that none of it crossed present reservation or trust land.

South Dakota’s Public Utilities Commission granted a permit in March 2010 and set its final terms, 50 conditions, on June 29, 2010. In January 2016 it voted unanimously that the company could still meet them. Tribal governments took part: Standing Rock’s water resources director testified that the project threatened tribal water supplies in long drought, and Cheyenne River’s Section 106 coordinator warned that slumping riverbanks made a failure likely. The commission found that neither showed the company unable to meet its conditions, and it ruled that it had no power to decide the treaty rights the tribes raised.

The federal permit to cross the Canadian border was denied in November 2015, granted on March 29, 2019, and revoked on January 20, 2021, by President Joe Biden’s Executive Order 13990. TC Energy ended the project on June 9, 2021, with three South Dakota pump stations about 80 percent built; they were sold for salvage. The Rosebud Sioux Tribe and the Fort Belknap Indian Community, which had sued in 2018, agreed that May that the revocation made their case moot. The commission closed its file on March 22, 2022.

Keystone’s Spill Record in South Dakota

The first Keystone line has carried Canadian crude through eastern South Dakota since 2010, on a 220-mile route from Marshall County to Yankton County that crosses the James River and, at the Nebraska line, the Missouri. Before it was built, the commission accepted a risk estimate the company had commissioned, drawn from records of spills of 50 barrels or more: no more than one such spill every 41 years anywhere on the South Dakota route.

Two came within eight years. In April 2016 a failed weld near Freeman, in Hutchinson County, leaked about 400 barrels. In November 2017 the line ruptured near Amherst, in Marshall County, in the largest spill of its first decade: 6,592 barrels, by the Government Accountability Office’s count. The cause was a fatigue crack that probably began with damage from a vehicle during construction. The company closed valves within 15 minutes, and the cleanup removed more than 112,000 tons of oil-soaked soil.

State spill records list four smaller Keystone releases in South Dakota, all at pump stations in 2010 and 2011, and none since Amherst as of November 2026. Systemwide, the federal auditors counted 22 accidents from 2010 through 2020, most under 50 barrels and on company property. South Bow, spun off from TC Energy in October 2024, now owns the line.

Dakota Access Under Lake Oahe

Corps of Engineers map of Lake Oahe over aerial imagery, running from Oahe Dam near Pierre, South Dakota, north to Bismarck, North Dakota, with the Standing Rock and Cheyenne River reservations shaded west of the lake and an inset locating it in the Missouri River basin
Lake Oahe from Oahe Dam, near Pierre, north to Bismarck, on a 2017 Corps of Engineers map. The Standing Rock and Cheyenne River reservations are shaded on its west side. Map: U.S. Army Corps of Engineers, Northwestern Division, Oahe Water Control Manual (2018), Plate IV-12 (public domain)

Dakota Access, built and operated by Energy Transfer, carries Bakken crude nearly 1,200 miles from North Dakota to southern Illinois. It runs through eastern South Dakota but crosses the Missouri in North Dakota, at least 95 feet beneath the bed of Lake Oahe and about half a mile north of the Standing Rock Reservation. To make the reservoir, behind a 1958 dam, Congress took 56,000 acres of the Standing Rock Reservation and 104,420 acres of Cheyenne River Sioux Tribe trust land. The Standing Rock Sioux Tribe draws its drinking water from the lake and describes the route as crossing unceded treaty land under the 1851 Fort Laramie Treaty. An earlier plan to cross north of Bismarck, about 50 miles upstream, was dropped.

The Army Corps of Engineers granted the lake easement on February 8, 2017, and oil began flowing that June. On March 25, 2020, a federal judge in Washington ordered a full environmental impact statement, ruling that unrebutted expert critiques of leak detection, the operator’s safety record, winter conditions and the worst-case spill left the crossing’s effects “highly controversial.” That July the judge vacated the easement and ordered the pipeline emptied. On January 26, 2021, the appeals court upheld the review order and the vacatur but reversed the shutdown, and the oil kept moving.

Where Does the Lake Oahe Review Stand?

The review is finished, and the tribe is back in court. The Corps’ final environmental impact statement, released December 19, 2025, put the odds of a worst-case spill under the lake at between one in 100,000 and one in a million years, while granting that the harm from one could be moderate to major. On May 21, 2026, the Corps signed its record of decision for a new easement with added conditions: new leak-detection technology, groundwater and surface-water monitoring, an alternate water supply and a food distribution plan for communities that rely on the lake.

“Lake Oahe is our sole source of drinking water,” Standing Rock Chairman Steve Sitting Bear said in October 2026, as the tribe sued the Corps and the Pipeline and Hazardous Materials Safety Administration over the decision. As of November 2026, that October filing is the latest step found in the case.

The Case for the Pipelines

Backers argue from jobs, taxes, supply and safety. The commission found in 2010 that Keystone XL would bring jobs and pay property taxes estimated in the millions of dollars a year, and by 2016 a link was planned to feed it up to 100,000 barrels a day of Montana and North Dakota crude.

Energy Transfer says Dakota Access paid more than $222 million in property taxes from 2017 through 2023, carries about 60 percent of the oil the Mandan, Hidatsa and Arikara Nation produces, and has operated safely since June 2017. The line moves just under half of North Dakota’s oil. In 2021 the company told the court of no spill at Lake Oahe or anywhere on the main line, a record the tribes did not dispute, though they cited minor incidents at its facilities and spills on another Energy Transfer pipeline.

Federal auditors rated Keystone’s record on serious accidents better than the national average for 2010 to 2020, though worse from 2016 on, and state officials told them the company cleaned up its largest spills promptly.

The Case Against

Keystone’s South Dakota spills outran the forecast the state accepted, and the auditors traced both to construction and fabrication problems, not corrosion. Expert comments the court found unrebutted cited federal data showing 276 incidents and more than $53 million in property damage on the operator’s pipelines from 2006 to 2016.

Standing Rock adds that the line can now carry as much as 1.1 million barrels a day, close to double its original design, while the tribe still lacks an emergency response plan it can rely on for a worst-case spill. The Cheyenne River Sioux Tribe’s reservation borders the lake too, 73 miles downstream of the crossing. A low chance of a spill does not change what a spill would reach.

Connected

Local organizations

  • Dakota Rural Action, which describes itself as “a grassroots, family agriculture and conservation group that organizes South Dakotans.”
  • Honor the Earth, an Indigenous-led organization that describes itself as “committed to protecting the lifeways and sovereignty of our Indigenous Relatives across Mother Earth.”
  • North Dakota Petroleum Council, which describes itself as “the primary voice of the oil and gas industry in North Dakota since 1952.”

Further reading

Sources

  1. U.S. Energy Atlas: Crude Oil Pipelines, Petroleum Product Pipelines and Hydrocarbon Gas Liquids Pipelines layers. U.S. Energy Information Administration (data as of 2025, read from the copies of these layers kept on ArcGIS Online by Esri’s Federal User Community; consulted November 2026).
  2. Tanks and Spills Map: spill reports. South Dakota Department of Agriculture and Natural Resources (consulted November 2026).
  3. Bridger pipeline gets presidential nod. Sarah Pridgeon, Sundance Times, 2026.
  4. Final Decision and Order; Notice of Entry, Docket HP09-001 (Keystone XL). South Dakota Public Utilities Commission, March 2010.
  5. Amended Final Decision and Order; Notice of Entry, Docket HP09-001 (Keystone XL). South Dakota Public Utilities Commission, 2010.
  6. Final Decision and Order Finding Certification Valid and Accepting Certification, Docket HP14-001 (Keystone XL). South Dakota Public Utilities Commission, 2016.
  7. Executive Order 13990: Protecting Public Health and the Environment and Restoring Science To Tackle the Climate Crisis. Federal Register, 86 FR 7037, 2021.
  8. TC Energy confirms termination of Keystone XL Pipeline Project. TC Energy, 2021 (the company’s own account).
  9. Keystone XL Pipeline Project, South Dakota Public Utilities Commission Final Report. TC Energy, filed in Docket HP09-001, 2021.
  10. Docket HP09-001: TransCanada Keystone Pipeline, LP (Keystone XL). South Dakota Public Utilities Commission.
  11. Rosebud Sioux Tribe v. Biden. Sabin Center for Climate Change Law, Columbia Law School, Climate Litigation Database.
  12. Final Decision and Order; Notice of Entry, Docket HP07-001 (Keystone Pipeline). South Dakota Public Utilities Commission, 2008.
  13. Pipeline Safety: Information on Keystone Accidents and DOT Oversight (GAO-21-588). U.S. Government Accountability Office, 2021.
  14. South Bow Reports Third-Quarter 2026 Results. South Bow, 2026 (the company’s own account).
  15. Standing Rock Sioux Tribe v. U.S. Army Corps of Engineers, Memorandum Opinion of June 14, 2017. U.S. District Court for the District of Columbia (GovInfo).
  16. Standing Rock Sioux Tribe v. U.S. Army Corps of Engineers, Memorandum Opinion of March 25, 2020. U.S. District Court for the District of Columbia (GovInfo).
  17. Standing Rock Sioux Tribe v. U.S. Army Corps of Engineers, Memorandum Opinion of July 6, 2020. U.S. District Court for the District of Columbia (GovInfo).
  18. Standing Rock Sioux Tribe v. U.S. Army Corps of Engineers, Memorandum Opinion of May 21, 2021. U.S. District Court for the District of Columbia (GovInfo).
  19. Dakota Access Pipeline regulatory tracker. Environmental and Energy Law Program, Harvard Law School, updated 2026.
  20. Final environmental impact statement for DAPL easement shows ‘remote’ chance of leak under Lake Oahe. Michael Anthony, KFYR, 2025.
  21. Notice of Availability of the Record of Decision for the Final Environmental Impact Statement for the Dakota Access Pipeline, Lake Oahe Crossing, North Dakota. U.S. Army Corps of Engineers, Federal Register, 91 FR 34227, 2026.
  22. Army Corps grants final approval for Dakota Access Pipeline, 9 years after oil began flowing. Mary Steurer, North Dakota Monitor (republished by KOTA), 2026.
  23. Standing Rock Sioux Tribe Files New Federal Lawsuit Against U.S. Army Corps of Engineers and PHMSA over Dakota Access Pipeline Record of Decision. Standing Rock Sioux Tribe, 2026.
  24. SRST Files #NODAPL Fed Lawsuit Seeking Immediate Shutdown of Dakota Access Pipeline. Standing Rock Sioux Tribe, 2024.
  25. DAPL Pipeline Facts. Energy Transfer (the company’s own account), 2026.

Last reviewed: